You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jl Perintis Kemerdekaan Dinormalisasi

Water Channel Along Jl Perintis Kemerdekaan Normalized

The water channel along Jalan Perintis kemerdekaan, Kayu Putih, Pulogadung, East Jakarta, was normalized. The effort was done to anticipate the rainy season.

The channel was not dredged for 2 years. We also deepen the channel into 1-1.5 meter

Based on Beritajakarta.com's observation, the workers used simple tools to clean the channel. The mud taken from the channel put into the sack and placed on the sidewalk to get dry.

East Jakarta Head Sub-dept. of Water Management, Ahmad Yazied Bustomi, said the length of the channel is 1 kilometer and width is 80-100 centimeter.

November, Mampang River Normalized

"The channel was not dredged for 2 years. We also deepen the channel into 1-1.5 meter," he said.

The project is targeted to be done before December ends.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1127 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing